 |
Engineering Change Order
In the fast-paced world in which you compete, the flexibility to introduce engineering changes without losing control of manufacturing operations is mandatory. Intuitive ERP's Engineering Change Order functionality provides you with the information to assess the impact of engineering changes throughout your operations.
With Intuitive ERP, you can quickly generate engineering change requests (ECRs) to view the impact and benefits of the proposed changes and then easily convert the ECRs to engineering change orders (ECOs) or temporary deviation authorizations (TDAs). With one mouse click you can determine the cost of the change. You can also track bills of material and item revision levels, as well as maintain data for open work orders, purchase orders and on-hand balances.
|
 |
|
 |